Pre-application Programme Document
PROGRAMME DOCUMENT:
Stage 2 Consultation Documents (2025)
The documents on this page are those used in 2025 for the Stage 2 consultation.
Admin Documents:
HIDDEN TOGGLE
HIDDEN TOGGLE – DO NOT DELETE
By default, the first toggle on the Divi accordion is open and there is no option to make it closed. Fortunate there is a simple trick to make the first toggle also closed.
1.0 Documents
Draft Plans/Drawings/Sections:
HIDDEN TOGGLE
HIDDEN TOGGLE – Don’t Delete
By default, the first toggle on the Divi accordion is open and there is no option to make it closed. Fortunate there is a simple trick to make the first toggle also closed.
2.2 Works Plans
2.3 Access & Rights Plans
2.4 Location Plan
2.5 Parameters Plan
2.6 Illustrative Masterplan
2.7 Highways Plans
2.8 Highways Classifications
2.9 Traffic Regulation Plans
2.10 Speed Limit Plans
2.11 Rail Plans
2.12 Bridge Plans
2.12 – Bridge Plans Overview Plan
2.12A – B430 Ardley Bypass Private Rail Overbridge (Bridge 06)
2.12B – B430 Ardley Bypass Chiltern Mainline Overbridge (Bridge 07)
2.12C – M40 – A43 Northbound M40 Overbridge (Bridge 12)
2.12D – B430 Ardley Road Overbridge (Bridge 16)-Square End Option
2.12E – Middleton Stoney Relief Road Underpass (Bridge 19)
2.12F – M40 J10 Northbound Culvert (Bridge 13)
2.12G – Heyford Park Link Road Culvert (Bridge 18)
2.12H – Middleton Stoney Relief Road Culvert (Bridge 20)
2.13 Components Plan
2.14 Listed Building Plans
2.14A – Existing Ground Floor Plan
2.14B – Existing Roof Floor Plan
2.14C – Long Section Existing
2.14D – Short Section Existing
2.14E – South Elevation Existing
2.14F – North Elevation Existing
2.14G – East Elevation Existing
2.14H – Wes tElevation Existing
2.14I – Ground Floor Proposed
2.14J – Proposed Roof Plan
2.14K – Long Section Proposed
2.14L – Short Section Proposed
2.14M – South Elevation Proposed
2.14N – North Elevation Proposed
2.14O – East Elevation Proposed
2.14P – West Elevation Proposed
2.14Q – Ground Floor Demolition Plan
2.14R – Roof Demolition Plan
2.14S – Fabric Removal Long Section
2.14T – Fabric Removal Short Section
2.14U – Fabric Removal North Elevation
2.14V – Fabric Removal South Elevation
2.14W – Fabric Removal East Elevation
2.14X – Fabric Removal West Elevation
2.15 Tree & Hedgerow Removal Plans
2.15A – Tree and Hedgerow Retention and Removal Plan
2.15B – Tree and Hedgerow Retention and Removal Plan
2.15C – Tree and Hedgerow Retention and Removal Plan
2.15D – Tree and Hedgerow Retention and Removal Plan
2.15E – Tree and Hedgerow Retention and Removal Plan
2.15F – Tree and Hedgerow Retention and Removal Plan
2.15G – Tree and Hedgerow Retention and Removal Plan
2.15H – Tree and Hedgerow Retention and Removal Plan
2.15I – Tree and Hedgerow Retention and Removal Plan
2.15J – Tree and Hedgerow Retention and Removal Plan
2.15K – Tree and Hedgerow Retention and Removal Plan
2.15L – Tree and Hedgerow Retention and Removal Plan
2.15M – Tree and Hedgerow Retention and Removal Plan
2.16 Central Hub Illustrative Masterplans
Draft Development Consent Order Documents :
HIDDEN TOGGLE
HIDDEN TOGGLE – DO NOT DELETE
By default, the first toggle on the Divi accordion is open and there is no option to make it closed. Fortunate there is a simple trick to make the first toggle also closed.
3.0 Documents
Draft Reports and Statement:
HIDDEN TOGGLE
HIDDEN TOGGLE – Don’t Delete
By default, the first toggle on the Divi accordion is open and there is no option to make it closed. Fortunate there is a simple trick to make the first toggle also closed.
5.1 Consultation Report
5.1A – Draft Consultation Report (for Stage 1) – Appendices 1-2
5.1B – Draft Consultation Report (for Stage 1) – Appendix 3
5.1C – Draft Consultation Report (for Stage 1) – Appendix 4
5.1D – Draft Consultation Report (for Stage 1) – Appendices 5-12
5.1E – Consultation Report – Appendix 13A – 1st Land Notices
5.1E – Consultation Report – Appendix 13B – 2nd Land Notices
5.1E – Consultation Report – Appendix 13C – TerraQuest Notices
5.1F – Draft Consultation Report (for Stage 1) – Appendices 14-17
5.2 sHRA Screening Assessment
5.6 Planning Statement
Draft Environmental Impact Assessment:
HIDDEN TOGGLE
HIDDEN TOGGLE – DO NOT DELETE
By default, the first toggle on the Divi accordion is open and there is no option to make it closed. Fortunate there is a simple trick to make the first toggle also closed.
Chapter 1 - Introduction
Chapter 2 - Description of Development and Alternatives
Chapter 3 - Transport
Appendix
6.1A – ES3.1 Sustainable Transport Strategy
6.1B – ES3.2 Public Transport Strategy
6.1C – ES3.3 Framework Travel Plan
6.1D – ES3.4 HGV Routeing Strategy
6.1E – ES3.5 Transport Modelling Methodology
6.1F – ES3.6 Stage 2 Transport Modelling
6.1G – ES3.7 Stage 3 Transport Modelling (Interim Report)
6.1H – ES3.8 Walking, Cycling & Horse-Riding Assessment Report
6.1I – ES3.9 Summary Of Agreed Transport Modelling Scenarios
6.1J – ES3.10 Personal Injury Accident Assessment Technical Note
6.1K – ES 3.11 BTM Forecasting Report
6.1L – ES3.12 Walking, Cycling, And Rights Of Way Strategy Plan
6.1M – ES3.13 Phase 1 Walking, Cycling, And Rights Of Way Strategy Plan
6.1N – ES3.14 Phase 2 Walking, Cycling, And Rights Of Way Strategy Plan
6.1O – ES3.15 M40 Junction 10 Options Report
6.1P – ES3.16 M40 Junction 10 Options Report ‘Traffic Flow Derivations’
6.1Q – ES3.17 M40 Junction 10 Options Report ‘Response To National Highways Comments On Options 11, 13, 18, And 19’
6.1R – ES3.18 Scope Of Highway Design Pre-DCO
6.1S – ES3.19 M40 Junction 10 Options 3a And 3b
6.1T – ES3.20 M40 Junction 10 Option 25
6.1U – ES3.21 M40 Junction 10 Option 25a
6.1V – ES3.22 M40 Junction 10 Highway Improvement
6.1W – ES3.23 Embedded Highway Works Phasing
6.1X – ES3.24 M40 Junction 10 Option 28
6.1Y – ES3.25 M40 Junction 9
6.1Z – ES3.26 Middleton Stoney Relief Road And Heyford Park Link Road Options Report6.1
AA – ES3.27 Highway Works Phase 1
6.1AB – ES3.28 Highway Works Phase 2
6.1AC – ES3.29 Construction Traffic
6.1AD – ES3.30 Trip Generation
6.1AE – ES3.31 Light Vehicle Trip Distribution
6.1AF – ES3.32 HGV Trip Distribution
6.1AG – ES3.33 Road Freight To Rail Freight HGV Mileage Saving
6.1AH – ES3.34 Highway Works Phase 1
6.1AI – ES3.35 Highway Works Phase 2
Chapter 4 - Air Quality & Odour
Chapter 5 - Noise & Vibration
Appendix
6.5A – Appendix 5.1 Glossary of Acoustic Terms
6.5B – Appendix 5.2 Noise & Vibration Receptor Locations
6.5C – Appendix 5.3 Noise & Vibration Monitoring Locations
6.5D – Appendix 5.4 Noise and Vibration Survey Monitoring Equipment
6.5E – Appendix 5.5 Noise and Vibration Survey Summary Results
6.5F – Appendix 5.6 Noise Action Planning – Important Areas
6.5G – Appendix 5.7 Derivation of Background Sound Levels for SRFI Operational Noise Assessment
6.5H – Appendix 5.8 Construction Noise Information
6.5I – Appendix 5.9 Construction Noise Predictions
6.5J – Appendix 5.10 Operational Noise Assumptions
6.5K – Appendix 5.11 Mainline Rail Information and Predictions
6.5L – Appendix 5.12 Operational Noise Predictions and Target fixed plant levels
Chapter 6 - Ecology & Arb
Appendix
6.6A – ES6.1: Ecological Appraisal Report (Redacted For Public Consultation)
6.6B – ES6.2: Ardley Cutting & Quarry Sssi Botanical Survey
6.6C – ES6.3: Bat Report
6.6D – ES6.4: GCN Report
6.6E – ES6.5: Bird Survey Report
6.6F – ES6.6: Badger Survey Report (Confidential)
6.6G – ES6.7: Butterfly Survey Report
6.6H – ES6.8: Arboricultural Assessment
6.6I – ES6.9: Biodiversity Net Gain Assessment
6.6J – ES6.10: Shadow Habitats Regulation Assessment
Chapter 7 - Landscape and Visual Assessment
Chapter 8 - Lighting
Chapter 9 - Water Environment
Chapter 10 - Heritage & Archaeology
Appendix
6.10A – ES10.1: Archaeological Desk-Based Assessment
6.10B – ES10.2: Geophysical Survey Report
6.10C – ES10.3: Archaeological Trial Trench Summary
6.10D – ES10.4: Built Heritage Assessment Of Significance
6.10E – ES10.5: Assessment Of Airborne Remote Sensing Data And Satellite Imagery For Archaeology
6.10F – ES10.6: Historic Landscape Assessment
6.10G – ES10.7: Built Heritage Impact Assessment
6.10H – ES10.8: Draft Archaeological Mitigation Strategy
Chapter 11 - Ground Conditions
Appendix
6.11A – OxSRFI ES Appendix 11.1 Main Site Phase 1 Desk Study – Part 1 – Pages 1-300
6.11A – OxSRFI ES Appendix 11.1 Main Site Phase 1 Desk Study – Part 2 – Pages 301-586
6.11B – OxSRFI ES Appendix 11.2 Off-site Highways Desk Study – Part 1 – Pages 1 – 355
6.11B – OxSRFI ES Appendix 11.2 Off-site Highways Desk Study – Part 2 – Pages 356-650
6.11C – OxSRFI ES Appendix 11.3 Minerals Assessment
6.11D – OxSRFI ES Appendix 11.4 Main Site Phase 2 Report
6.11E – OxSRFI ES Appendix 11.5 Road Corridor GI
6.11F – OxSRFI ES Appendix 11.6 Landfill GI
6.11G – OxSRFI ES Appendix 11.7 Main Site Isopachyte Cut and Fill
6.11H – OxSRFI ES Appendix 11.8 Preliminary Risk Classification
6.11I – OxSRFI ES Appendix 11.9 National and Local Policy Extract
6.11J – OxSRFI ES Appendix 11.10 Ardley Trackways Tech Note Final
6.11k – OxSRFI ES Appendix 11.11 Jurassic Rock Exposure Technical Note
Chapter 12 - Socio-Economics
Chapter 13 - Waste
Chapter 14 - Agricultural Land
Chapter 15 - Climate Change
Chapter 16 - Cumulative Effects
Other ES Docs, including Non-Technical Summary
SUPPORTING DOCUMENTS:
HIDDEN TOGGLE
HIDDEN TOGGLE – Don’t Delete
By default, the first toggle on the Divi accordion is open and there is no option to make it closed. Fortunate there is a simple trick to make the first toggle also closed.
7.0 Documents
7.2AC1 – Appendix C1 Network Rail Pathing Letter April 2022
7.2AC2 – Appendix C2 PRA Pathing Study Report May 2025
7.2D1 – Appendix D1 Rail Terminal Phase 1 Illustrative Layout
7.2D2 – Appendix D2 Rail Terminal Future Phase Illustrative Layout
7.2E – Appendix E Agreed Position Statement ORL and NR
7.2B – GB Rail Freight Statement
7.3 – Commitments Tracker
7.6 – Project Overview Document (POD)
Stage 1 Consultation Documents (2022)
The documents below are those used in 2022 for the Stage 1 non-statutory consultation. They are not part of the current Stage 2 consultation, but are available for reference. Please see above the updated set of draft documents and plans which form the Stage 2 (statutory) consultation from 23rd September 2025 – 4th November 2025.
KEY DOCUMENTS:
HIDDEN TOGGLE
HIDDEN TOGGLE – DO NOT DELETE
By default, the first toggle on the Divi accordion is open and there is no option to make it closed. Fortunate there is a simple trick to make the first toggle also closed.
OxSRFI Stage 1 Consultation
Plans
– Draft Works Plan
– Draft Public Rights of Way Strategy Plan
– Location Plan
– Draft Parameters Plan
– Draft Illustrative Masterplan
Draft Highways Plans
– OxSRFI principal access roundabout GA-S1-P03
– Heyford Park Link Road West GA-S1-P03
– Middleton Stoney Relief Road GA-S1-P3
– Heyford Park Link Road East and B430 Junction GA-S1-P01
– Ardley Bypass – General Arrangement & Vertical Alignment-S1-P02
– Highway Works Overview-S1-P03
– M40 Junction 10 Overall General Arrangement-S1-P01
Draft Rail Plans
– Ardley SRFI Long Section Sht 1 P05
– Ardley SRFI Long Section Sht 2 P03
– Masterplan with D5.33 terminal layout and P10 track layout Rail Terminal Inset
Statement of Community Consultation
Draft Development Consent Order
Draft Explanatory Memorandum
Briefing Document
EIA: ENVIRONMENTAL STATEMENT:
HIDDEN TOGGLE
HIDDEN TOGGLE – DO NOT DELETE
By default, the first toggle on the Divi accordion is open and there is no option to make it closed. Fortunate there is a simple trick to make the first toggle also closed.
Chapter 1 - Introduction
Chapter 2 - Description of Development and Alternatives
Chapter 3 - Transport
– Appendix 3.1 – Middleton Stoney-Heyford Park Options Report FINAL Mar22
– Appendix 3.2 – Existing PRoW Network
– Appendix 3.3 – Bicester OxSRFI Technical Note
– Appendix 3.4 – Highway Works Overview
– Appendix 3.5 – M40 J10 OR Traffic Flow Derivation
– Appendix 3.6 – Ardley Bypass – General Arrangement & Vertical Alignment
– Appendix 3.7 – TN5 M40 Junction 10 Options Report ( Part 1 – Pages 1 – 409 )
– Appendix 3.7 – TN5 M40 Junction 10 Options Report ( Part 2 – Pages 410 – 872)
– Appendix 3.8 – TN8 M40 Junction Options 3A & 3B
– Appendix 3.9 – TN5 Addendum’ Response to NH comments
– Appendix 3.10 – TN9 M40 Junction 10 Option 25
– Appendix 3.11 – M40 Junction 10 Overall General Arrangement
– Appendix 3.12 – OxSRFI principal access roundabout
– Appendix 3.13 – Middleton Stoney-Heyford Park Options Report FINAL Mar22
– Appendix 3.14 – NMU Strategy Overview
– Appendix 3.15 – Technical Note 3 Trip Generation
Chapter 4 - Air Quality (including Human Health & Odour)
Chapter 5 - Noise & Vibration (including Human Health)
– Chapter 5 – Noise & Vibration (including Human Health)
– Appendix 5.1 – Glossary Of Terms
– Appendix 5.2 – Noise And Vibration Receptor Locations
– Appendix 5.3 – Scoping Opinion Responses
– Appendix 5.4 – Noise And Vibration Monitoring Locations
– Appendix 5.5 – Summary Of Noise And Vibration Survey Monitoring Equipment
– Appendix 5.6 – Noise Survey Summary Results
– Appendix 5.7 – Noise Action Planning – Important Areas
– Appendix 5.8 – Derivation Of Background Sound Levels For SRFI Operational Noise Assessment
Chapter 6 - Ecology including Arboriculture
– Chapter 6 – Ecology including Arboriculture
– Appendix 6.1 – Ecological Appraisal Report Redacted Draft
– Appendix 6.2 – Ardley Cutting & Quarry SSSI Botanical Survey
– Appendix 6.3 – Bat Report
– Appendix 6.4 – GCN Report
– Appendix 6.5 – Breeding Bird Report
– Appendix 6.6 – Winter Bird Report
– Appendix 6.7 – Arboricultural Assessment
Chapter 7 - Landscape & Visual Effects
– Chapter 7 – Landscape & Visual Effects
– Appendix 7.1 – LVIA Methodology and Assessment Criteria
– Appendix 7.2 – Arboricultural Assessment (Draft)
– Fig.7.1 – Aerial Photograph
– Fig.7.2 – Environmental Designations and Features
– Fig.7.3 – Landscape Character
– Fig.7.4 – Topography
– Fig.7.5 – Photo Viewpoint Locations (Provisional)
– Fig.7.6 – Photo Viewpoints
Chapter 8 - Lighting
Chapter 9 - Water Environment (including Flood Risk, Drainage & Water Quality)
Chapter 10 - Heritage (Built & Archaeology)
– Chapter 10 – Heritage (Built & Archaeology)
– Appendix 10.1 – Archaeological Desk-Based Assessment
– Appendix 10.2 – Geophysical Survey – Part 1 (Pages 1-35)
– Appendix 10.2 – Geophysical Survey – Part 2 (Pages 36-60)
– Appendix 10.2 – Geophysical Survey – Part 3 (Pages 61-66)
– Appendix 10.2 – Geophysical Survey – Part 4 (Pages 67-70)
– Appendix 10.2 – Geophysical Survey – Part 5 (Pages 71-75)
– Appendix 10.2 – Geophysical Survey – Part 6 (Pages 76-79)
– Appendix 10.2 – Geophysical Survey – Part 7 (Pages 80-87)
– Appendix 10.3 – Archaeological Trial Trench Summary
– Appendix 10.3 – Figure
– Appendix 10.4 – Built Heritage Statement
– Appendix 10.5 – Assessment of Airborne Remote Sensing Data and Satellite Imagery for Archaeology
– Fig 10.1 Map of Archaeological Receptors
– Fig 10.2 Map of Built Heritage Receptors
Chapter 11 - Ground Conditions
– Chapter 11 – Ground Conditions
– Appendix 11.1 – Main Site Phase 1 Desk Study-Part1-(Pages1-70)
– Appendix 11.1 – Main Site Phase 1 Desk Study-Part2-(Pages71-76)
– Appendix 11.1 – Main Site Phase 1 Desk Study-Part3-(Pages77-300)
– Appendix 11.1 – Main Site Phase 1 Desk Study-Part4-(Pages301-586)
– Appendix 11.2 – Off-site Highways Desk Study – Part 1 (Page1 – 61)
– Appendix 11.2 – Off-site Highways Desk Study – Part 2 (Page62 – 140)
– Appendix 11.2 – Off-site Highways Desk Study – Part 3 (Page141 – 180)
– Appendix 11.2 – Off-site Highways Desk Study – Part 4 (Page181 – 230)
– Appendix 11.2 – Off-site Highways Desk Study – Part 5 (Page231 – 300)
– Appendix 11.2 – Off-site Highways Desk Study – Part 6 (Page301 – 357)
– Appendix 11.2 – Off-site Highways Desk Study – Part 7 (Page358 – 500)
– Appendix 11.2 – Off-site Highways Desk Study – Part 8 (Page501 – 569)
– Appendix 11.2 – Off-site Highways Desk Study – Part 9 (Page570 – 662)
– Appendix 11.3 – Main Site GI Report – Part 1 (Pages 1-90)
– Appendix 11.3 – Main Site GI Report – Part 2 (Pages 91-251)
– Appendix 11.3 – Main Site GI Report – Part 3 (Pages 252-369)
– Appendix 11.3 – Main Site GI Report – Part 4 (Pages 370-708)
– Appendix 11.4 – Minerals Assessment Part 1 (Pages 1-100)
– Appendix 11.4 – Minerals Assessment Part 2 (Pages 101-175)
– Appendix 11.4 – Minerals Assessment Part 3 (Pages 176-230)
– Appendix 11.5 – Preliminary Earthworks
– Appendix 11.6 – Preliminary Risk Classification
Chapter 12 - Socio-economic (including Human Health)
Chapter 13 - Waste
Chapter 14 - Agricultural Land
Chapter 15 - Climate Change
SUPPORTING DOCUMENTS:
HIDDEN TOGGLE
HIDDEN TOGGLE – DON’T DELETE
By default, the first toggle on the Divi accordion is open and there is no option to make it closed. Fortunate there is a simple trick to make the first toggle also closed.
Local Site Notice
Public Exhibition Boards
Environmental Statement Scoping information (2021):
HIDDEN TOGGLE
HIDDEN TOGGLE – Don’t Delete
By default, the first toggle on the Divi accordion is open and there is no option to make it closed. Fortunate there is a simple trick to make the first toggle also closed.
Applicant’s ES Scoping Report
– Applicant’s ES Scoping Report
– Applicant’s ES Scoping Report – Appendix 1 – Draft Development Components
– Applicant’s ES Scoping Report – Appendix 2 – Draft Features Plan
– Applicant’s ES Scoping Report – Appendix 3 – Draft Parameters Plan (Rev H)
– Applicant’s ES Scoping Report – Appendix 4 – Draft Illustrative Layout Masterplan
– Applicant’s ES Scoping Report – Appendix 5 – J10 Improvement Works Options
– Applicant’s ES Scoping Report – Appendix 6 – Middleton Stoney Relief Road Options