Documents prepared for the Stage 1 Consultation
KEY DOCUMENTS:
HIDDEN TOGGLE
HIDDEN TOGGLE – DO NOT DELETE
By default, the first toggle on the Divi accordion is open and there is no option to make it closed. Fortunate there is a simple trick to make the first toggle also closed.
OxSRFI Stage 1 Consultation
Plans
– Draft Works Plan
– Draft Public Rights of Way Strategy Plan
– Location Plan
– Draft Parameters Plan
– Draft Illustrative Masterplan
Draft Highways Plans
– OxSRFI principal access roundabout GA-S1-P03
– Heyford Park Link Road West GA-S1-P03
– Middleton Stoney Relief Road GA-S1-P3
– Heyford Park Link Road East and B430 Junction GA-S1-P01
– Ardley Bypass – General Arrangement & Vertical Alignment-S1-P02
– Highway Works Overview-S1-P03
– M40 Junction 10 Overall General Arrangement-S1-P01
Draft Rail Plans
– Ardley SRFI Long Section Sht 1 P05
– Ardley SRFI Long Section Sht 2 P03
– Masterplan with D5.33 terminal layout and P10 track layout Rail Terminal Inset
Statement of Community Consultation
Draft Development Consent Order
Draft Explanatory Memorandum
Briefing Document
EIA: ENVIRONMENTAL STATEMENT:
HIDDEN TOGGLE
HIDDEN TOGGLE – DO NOT DELETE
By default, the first toggle on the Divi accordion is open and there is no option to make it closed. Fortunate there is a simple trick to make the first toggle also closed.
Chapter 1 - Introduction
Chapter 2 - Description of Development and Alternatives
Chapter 3 - Transport
– Appendix 3.1 – Middleton Stoney-Heyford Park Options Report FINAL Mar22
– Appendix 3.2 – Existing PRoW Network
– Appendix 3.3 – Bicester OxSRFI Technical Note
– Appendix 3.4 – Highway Works Overview
– Appendix 3.5 – M40 J10 OR Traffic Flow Derivation
– Appendix 3.6 – Ardley Bypass – General Arrangement & Vertical Alignment
– Appendix 3.7 – TN5 M40 Junction 10 Options Report ( Part 1 – Pages 1 – 409 )
– Appendix 3.7 – TN5 M40 Junction 10 Options Report ( Part 2 – Pages 410 – 872)
– Appendix 3.8 – TN8 M40 Junction Options 3A & 3B
– Appendix 3.9 – TN5 Addendum’ Response to NH comments
– Appendix 3.10 – TN9 M40 Junction 10 Option 25
– Appendix 3.11 – M40 Junction 10 Overall General Arrangement
– Appendix 3.12 – OxSRFI principal access roundabout
– Appendix 3.13 – Middleton Stoney-Heyford Park Options Report FINAL Mar22
– Appendix 3.14 – NMU Strategy Overview
– Appendix 3.15 – Technical Note 3 Trip Generation
Chapter 4 - Air Quality (including Human Health & Odour)
Chapter 5 - Noise & Vibration (including Human Health)
– Chapter 5 – Noise & Vibration (including Human Health)
– Appendix 5.1 – Glossary Of Terms
– Appendix 5.2 – Noise And Vibration Receptor Locations
– Appendix 5.3 – Scoping Opinion Responses
– Appendix 5.4 – Noise And Vibration Monitoring Locations
– Appendix 5.5 – Summary Of Noise And Vibration Survey Monitoring Equipment
– Appendix 5.6 – Noise Survey Summary Results
– Appendix 5.7 – Noise Action Planning – Important Areas
– Appendix 5.8 – Derivation Of Background Sound Levels For SRFI Operational Noise Assessment
Chapter 6 - Ecology including Arboriculture
– Chapter 6 – Ecology including Arboriculture
– Appendix 6.1 – Ecological Appraisal Report Redacted Draft
– Appendix 6.2 – Ardley Cutting & Quarry SSSI Botanical Survey
– Appendix 6.3 – Bat Report
– Appendix 6.4 – GCN Report
– Appendix 6.5 – Breeding Bird Report
– Appendix 6.6 – Winter Bird Report
– Appendix 6.7 – Arboricultural Assessment
Chapter 7 - Landscape & Visual Effects
– Chapter 7 – Landscape & Visual Effects
– Appendix 7.1 – LVIA Methodology and Assessment Criteria
– Appendix 7.2 – Arboricultural Assessment (Draft)
– Fig.7.1 – Aerial Photograph
– Fig.7.2 – Environmental Designations and Features
– Fig.7.3 – Landscape Character
– Fig.7.4 – Topography
– Fig.7.5 – Photo Viewpoint Locations (Provisional)
– Fig.7.6 – Photo Viewpoints
Chapter 8 - Lighting
Chapter 9 - Water Environment (including Flood Risk, Drainage & Water Quality)
Chapter 10 - Heritage (Built & Archaeology)
– Chapter 10 – Heritage (Built & Archaeology)
– Appendix 10.1 – Archaeological Desk-Based Assessment
– Appendix 10.2 – Geophysical Survey – Part 1 (Pages 1-35)
– Appendix 10.2 – Geophysical Survey – Part 2 (Pages 36-60)
– Appendix 10.2 – Geophysical Survey – Part 3 (Pages 61-66)
– Appendix 10.2 – Geophysical Survey – Part 4 (Pages 67-70)
– Appendix 10.2 – Geophysical Survey – Part 5 (Pages 71-75)
– Appendix 10.2 – Geophysical Survey – Part 6 (Pages 76-79)
– Appendix 10.2 – Geophysical Survey – Part 7 (Pages 80-87)
– Appendix 10.3 – Archaeological Trial Trench Summary
– Appendix 10.3 – Figure
– Appendix 10.4 – Built Heritage Statement
– Appendix 10.5 – Assessment of Airborne Remote Sensing Data and Satellite Imagery for Archaeology
– Fig 10.1 Map of Archaeological Receptors
– Fig 10.2 Map of Built Heritage Receptors
Chapter 11 - Ground Conditions
– Chapter 11 – Ground Conditions
– Appendix 11.1 – Main Site Phase 1 Desk Study-Part1-(Pages1-70)
– Appendix 11.1 – Main Site Phase 1 Desk Study-Part2-(Pages71-76)
– Appendix 11.1 – Main Site Phase 1 Desk Study-Part3-(Pages77-300)
– Appendix 11.1 – Main Site Phase 1 Desk Study-Part4-(Pages301-586)
– Appendix 11.2 – Off-site Highways Desk Study – Part 1 (Page1 – 61)
– Appendix 11.2 – Off-site Highways Desk Study – Part 2 (Page62 – 140)
– Appendix 11.2 – Off-site Highways Desk Study – Part 3 (Page141 – 180)
– Appendix 11.2 – Off-site Highways Desk Study – Part 4 (Page181 – 230)
– Appendix 11.2 – Off-site Highways Desk Study – Part 5 (Page231 – 300)
– Appendix 11.2 – Off-site Highways Desk Study – Part 6 (Page301 – 357)
– Appendix 11.2 – Off-site Highways Desk Study – Part 7 (Page358 – 500)
– Appendix 11.2 – Off-site Highways Desk Study – Part 8 (Page501 – 569)
– Appendix 11.2 – Off-site Highways Desk Study – Part 9 (Page570 – 662)
– Appendix 11.3 – Main Site GI Report – Part 1 (Pages 1-90)
– Appendix 11.3 – Main Site GI Report – Part 2 (Pages 91-251)
– Appendix 11.3 – Main Site GI Report – Part 3 (Pages 252-369)
– Appendix 11.3 – Main Site GI Report – Part 4 (Pages 370-708)
– Appendix 11.4 – Minerals Assessment Part 1 (Pages 1-100)
– Appendix 11.4 – Minerals Assessment Part 2 (Pages 101-175)
– Appendix 11.4 – Minerals Assessment Part 3 (Pages 176-230)
– Appendix 11.5 – Preliminary Earthworks
– Appendix 11.6 – Preliminary Risk Classification
Chapter 12 - Socio-economic (including Human Health)
Chapter 13 - Waste
Chapter 14 - Agricultural Land
Chapter 15 - Climate Change
SUPPORTING DOCUMENTS:
HIDDEN TOGGLE
HIDDEN TOGGLE – DON’T DELETE
By default, the first toggle on the Divi accordion is open and there is no option to make it closed. Fortunate there is a simple trick to make the first toggle also closed.
Local Site Notice
Public Exhibition Boards
Environmental Statement Scoping information (2021):
HIDDEN TOGGLE
HIDDEN TOGGLE – Don’t Delete
By default, the first toggle on the Divi accordion is open and there is no option to make it closed. Fortunate there is a simple trick to make the first toggle also closed.
Applicant’s ES Scoping Report
– Applicant’s ES Scoping Report
– Applicant’s ES Scoping Report – Appendix 1 – Draft Development Components
– Applicant’s ES Scoping Report – Appendix 2 – Draft Features Plan
– Applicant’s ES Scoping Report – Appendix 3 – Draft Parameters Plan (Rev H)
– Applicant’s ES Scoping Report – Appendix 4 – Draft Illustrative Layout Masterplan
– Applicant’s ES Scoping Report – Appendix 5 – J10 Improvement Works Options
– Applicant’s ES Scoping Report – Appendix 6 – Middleton Stoney Relief Road Options